Industries · Telecom

Know what each site can carry, without sending an engineer

TriDyme audits your archives, calculates your towers and rooftops to EN 1993-3-1 and produces the deliverables — to decide where new equipment can go, reinforce rather than replace, and roll out faster.

TriDyme command centre: map of a telecom site portfolio coloured by structural scoreTriDyme command centre: map of a telecom site portfolio coloured by structural score

Chosen by telecom infrastructure operators

TowerCos, operators and contractors use TriDyme to make their site data reliable and speed up their studies.

Portfolio document audit

Knowing the real capacity of every site, without site visits

Portfolios of towers and rooftop sites, thousands of projects a year and decades of heterogeneous archives. Atlas structured the document archives, Norma checked the structures at scale and Forge took over the request processing pipeline.

See all references →
−80%time per project, from survey to deliverable
12,000structures analysed by the document pipeline
59%usable without any site visit

Results measured in the telecom vertical.

Your portfolio, in your own vocabulary

The ontology links each site to its structures, equipment, operators and documents. Each object points to its source in your systems: nothing is copied, nothing is migrated.

  • Site
  • Lattice tower
  • Monopole
  • Rooftop
  • Equipment (antenna, RRU, MW)
  • Operator
  • Document (as-built, calc note, equipment sheet)
  • Project
  • Site survey
  • Calculation note
  • Reinforcement

From archive to reinforcement drawing

Decades of archives, incomplete or inconsistent, spread across many subcontractors. Atlas reads and structures each site’s documents into a reliable register.

Reading as-built files and calc notes

Technical data extracted from every document, with a confidence level for each data point.

Missing documents

Missing or inconsistent documents detected site by site.

Score per site

A structural and documentary score to prioritise the sites to process.

Impact measured in production

−80%time per project, from survey to deliverable
12,000structures analysed by the document pipeline
59%usable without any site visit
48 hfrom workshop to first workflow in production

Cost

Analysing a site goes from one engineer-day to a few tens of euros.

Lead time

The survey, calculation and drawings pipeline goes from several weeks to a few days.

Investment

Reinforce instead of replace: the structure stays in service.

The platform on a telecom portfolio

Document audit sheet of a telecom site in TriDymeDocument audit sheet of a telecom site in TriDyme
Document auditProject history, documents and structural score of a site.
3D model of a lattice tower in the Structure 3D application3D model of a lattice tower in the Structure 3D application
Structural analysisFinite element model of a lattice tower generated from the archives.
3D BIM model of a telecom site with its equipment3D BIM model of a telecom site with its equipment
Site BIM modelTower, equipment and ground area, exportable to IFC.
Portfolio analytics dashboard in TriDymePortfolio analytics dashboard in TriDyme
Portfolio viewDashboards per portfolio, filters and natural-language search.

Connected to your systems

Data stays where it is: TriDyme reads it, exposes it and writes back to it.

Sitetracker

Roll-out project management.

SAP

Asset register and procurement.

Autodesk ACC

Project documents and models.

A capacity assessment on a sample of your portfolio

  1. 1

    Workshop

    One day with your teams to define the sample and the available data.

  2. 2

    Assessment

    Document audit and capacity calculation on the sample: capacity map and site ranking.

  3. 3

    Decision

    Results presented on your data, measured gain, then stop, extend or industrialise.

Audit a sample of your portfolio

Send us a batch of sites: we will show you what your archives really say about their capacity.