TriDyme provides independent structural quality control services to secure your construction projects. Our engineers verify calculation note compliance with Eurocodes, audit assumptions and calculation models, and conduct BIM model reviews. Our methodology is validated by Socotec and relies on our certified calculation tools for complete traceability of every verification performed.

Rigorous and independent verification of your structural studies, performed by experienced engineers using certified tools. Our audits cover the entire calculation process from assumption definition to result verification.
Thorough verification of your calculation notes including analysis of adopted assumptions, calculation model consistency, load combination compliance and result validation. Every checkpoint is documented and traceable.
Systematic control of Eurocode compliance and applicable national annexes. Verification of safety factors, design rules and constructive provisions specific to each material and structural element.
On-site inspection to verify conformity between execution plans and actual construction. Our engineers check structural element dimensions, reinforcement placement, connection details and material quality.
Detailed deliverable presenting every checkpoint, identified discrepancies, detected non-conformities and our corrective recommendations. An invaluable tool for securing your decisions and approvals.
A structured, rigorous and fully traceable control process developed in partnership with Socotec. Each step follows a defined protocol guaranteeing the thoroughness and reproducibility of our verifications.
Reception and thorough analysis of the complete study file (assumptions, plans, calculation notes, BIM models). Our team identifies areas of concern and defines the appropriate control plan.
Systematic verification using our Socotec DSTI certified calculation tools. Each calculation is independently reproduced to validate the results presented in the original calculation notes.
Precise identification of discrepancies, non-conformities and areas of concern with classification by criticality level (major, minor, observation). Each discrepancy is documented with applicable normative references.
Detailed summary report with prioritized corrective recommendations, enabling the owner and project manager to make appropriate decisions with full knowledge of the facts.

Request a compliance audit of your calculation notes and BIM models. Our team will propose a control plan tailored to your project and a detailed quote within 48 hours.